I am the type of person who never goes to the doctor, not because I don't like them but because I never get sick enough to warrant an office visit. Last week, I definately needed to make an office visit!!! Not sure if my body wanted me to slow down or if all this work has taken a toll on me, but I came down with a respiratory infection which shut me down all last week. It wasn't until this past weekend that I could even muster up the energy to do any work and that was only working at about 50%. Despite all that, the seeds have been layed to get that bathroom going. Hopefully within the next ten days I will have a complete funtioning bathroom.

Work to be done on bathroom
1) Build a new header to open up a new doorway from the kitchen into the bathroom and the bedroom.
2) Frame in old doorway into the bedroom.
3) Update electrical in the bathroom
4) Make any necessary plumbing updates
5) Purchase Shower and Vanity unit(s)
6) Drywall/Finish Bathroom walls
7) Fix and Install flooring (linoleum)
8) Install Shower/Toilet/Vanity
9) Finishing Touches